WA Earth and Environmental Science ATAR · Unit 2: Earth processes
Why did the estuary turn green?
The Peel-Harvey Estuary at Mandurah is two shallow basins fed by three rivers. By the late 1960s its seagrass was dying back and green weed was spreading, and in 1978 a toxic bloom covered the whole Harvey Estuary (DWER, 2020). In this lesson your team works out why, then designs a way to fix the estuary and tests the design in a model of it.
The estuary and the brief
The design brief
It is 1989. The Western Australian Government wants a plan to fix the Peel-Harvey, and your team has been asked for one. The plan has 25 years to work, from 1990 to 2014, and a budget of 10 points.
Many people care about what happens to the estuary:
- people who fish and catch crabs there, including the commercial fishers who work on it
- the people of Mandurah and the other towns on its shores
- the farmers whose land drains into its rivers
- everyone who values its wildlife. The estuary is part of the Peel-Yalgorup System, listed in 1990 as a wetland of international importance, a Ramsar site (Ramsar Sites Information Service).
Before you design anything, decide what your plan has to achieve. Designers call these goals the criteria. Limits that every design has to keep to, such as the budget, are constraints.
How the lesson works
Define
Read the brief and rank the criteria your plan has to meet.
Screen 1
Investigate
Find out how the estuary works and what went wrong. On each screen, note in your design log what the finding means for your plan.
Screens 2 to 6
Design and test
Choose a plan and run it for 25 years in the simulator. See where it fails, change it and run it again.
Screens 7 and 8
Compare and report
Compare your plan with what was really done, then write a design report.
Screens 9 and 10
Why design
A review of 37 studies found that school students who learned through design-based learning did better, on average, than students taught in other ways, and the difference was bigger in science than in maths (Delen and Sen, 2023).
This way of learning is called design-based learning. You learn the science because your design needs it.
What we are learning
How energy from the Sun, and matter such as nitrogen and phosphorus, flow through the living and non-living parts of an estuary, how people changed that flow in the Peel-Harvey, and how to design and test a fix.
I can
- 1explain the steps of a design challenge, and why the criteria are set before the design.
- 2describe the biotic and abiotic parts of the Peel-Harvey Estuary, and the job each living thing does.
- 3explain how photosynthesis brings the Sun’s energy into the estuary’s food web, and why less energy reaches each level.
- 4trace phosphorus and nitrogen from farmland to the estuary and the sea, and describe how nitrogen moves between the four spheres.
- 5use the estuary’s records to explain how extra nutrients led to weed, toxic blooms and fish kills.
- 6explain how salinity decides whether Nodularia can bloom.
- 7design a plan to fix the estuary, test it against criteria in a model, and improve it.
- 8judge the Dawesville Channel and the work in the catchment against the evidence of what happened.
WA Earth and Environmental Science ATAR, Year 11, Unit 2: Earth processes. The lesson is a Western Australian case study of energy and matter flow, as the syllabus asks, and it also covers eutrophication from Unit 3. The teacher notes at the end quote the syllabus and show which screen covers each point.
My notebook
Why does a design team agree on its criteria before it starts designing?
Peel-Harvey design report
Five pages: the brief and your criteria, a food web and the nitrogen cycle to complete, a record of each design and test, and your design report.
2Investigate
What lives here?
What are the living and non-living parts of the estuary, and what does each one do?
To fix an ecosystem, you need to know its parts and how they depend on each other.
This screen · about 25 minutes
- Explore the slice through a basin, and find out what each part is and what it does.
- Read how ecologists sort the parts of an ecosystem.
- Sort eight parts of the estuary, write in your design log, and answer the checks.
What your design needs to know
Your plan has to bring back the seagrass and keep crabs and fish in the estuary. Which living things depend on which, and what non-living things do they need?
Biotic and abiotic
An ecosystem is the living things in a place and the non-living things around them. The living, or biotic, parts of the estuary are its plants, algae, animals and bacteria. The non-living, or abiotic, parts include sunlight, water, salinity, dissolved oxygen, nutrients and sediment. Dead material, called detritus, is non-living too, even though it came from living things.
Ecologists sort living things by how they get their energy:
- Producers make their own food by photosynthesis. In the Peel-Harvey they are the seagrass, the green weed, or macroalgae, and the phytoplankton, which include cyanobacteria such as Nodularia.
- Consumers eat other living things. Animals that eat detritus, such as the sea mullet, are consumers called detritivores.
- Decomposers, such as the bacteria in the mud, break down dead material and release the nutrients in it.
The two kinds of part affect each other. Producers need light and nutrients, and animals need dissolved oxygen. Living things change the water in turn: photosynthesis adds oxygen, respiration and decomposition use it up, and decomposers return nutrients to the water.
Sort the parts
For each part, choose whether it is non-living, a producer, a consumer or a decomposer.
Design log
Check the science
Which of these is an abiotic part of the estuary?
What would happen in the estuary if the bacteria in the mud stopped breaking down dead material?
3Investigate
Where the energy goes.
How does energy from the Sun reach the crabs and fish, and why does so little of it get there?
Every living thing in the estuary runs on energy that producers captured from sunlight.
This screen · about 25 minutes
- Read how photosynthesis brings the Sun’s energy into the estuary.
- Build the food web, then take out the seagrass and see what changes.
- Change the transfer efficiency in the energy pyramid, write in your design log, and do the questions.
What your design needs to know
Crabs and fish to catch is one of your criteria. What do they eat, and where does their energy come from?
Energy from the Sun
Heat and light from the Sun drive many of Earth’s processes. In the estuary, the Sun’s heat evaporates water from the shallow basins, which makes them saltier in summer, and its light powers photosynthesis. In photosynthesis, producers use light energy to make glucose from carbon dioxide and water, and give off oxygen:
carbon dioxide + water → glucose + oxygen, using light energy
6CO₂ + 6H₂O → C₆H₁₂O₆ + 6O₂
The light energy is stored as chemical energy in the glucose. Photosynthesis is the main way the Sun’s energy is turned into a form that living things can use. Animals get it by eating the producers or each other, and detritus feeders and decomposers get it from dead material.
Why less energy reaches each level
A food web shows who eats whom, and each step up is a trophic level. At every level, living things use most of the energy in their food to stay alive and move, and that energy ends up as heat from respiration. Some stays in the parts that are not eaten, such as shells, and goes to the decomposers. Only the energy stored in new growth can be passed on, and it is a small share. In marine food webs the transfer efficiency from one level to the next averages about 10% (Pauly and Christensen, 1995), so an energy pyramid narrows quickly.
Energy and matter move through an ecosystem in different ways. Energy flows one way: it comes in as light and leaves as heat. Matter cycles: decomposers release the carbon, nitrogen and phosphorus in dead material, and producers use them again. That is why the nutrients matter as much as the light in the Peel-Harvey.
Design log
Use it
Check the science
In photosynthesis, what happens to the light energy that producers capture?
Why does a blue swimmer crab get only a small part of the energy that the producers captured?
4Investigate
Where the nutrients go.
How do phosphorus and nitrogen get from the farms into the estuary, and where do they go?
Producers need nutrients as well as light. In the Peel-Harvey, the trouble was too many nutrients.
This screen · about 30 minutes
- Run the phosphorus model with different years, soils and amounts of fertiliser.
- Find which land uses send the most phosphorus to the estuary.
- Follow nitrogen round its cycle through the four spheres, then write in your design log and do the questions.
What your design needs to know
To cut the nutrients, you need to know where they come from. Which land, and which conditions, send the most phosphorus into the estuary?
Phosphorus on the coastal plain
The estuary’s catchment covers 9,556 km², and 59% of it has been cleared (DWER). Much of the farmland on the coastal plain is on sandy soils, which have a low capacity to hold nutrients. Phosphorus from fertiliser and manure is lost from them by leaching, as water drains down through the soil, and by run-off (DAFWA, 2013). Drains and rivers carry it to the estuary, mostly in winter, when most of the rain falls.
From 2006 to 2015, an average of about 60 t of phosphorus reached the estuary each year. Beef grazing sent 40 t of it, about two-thirds, from only 11% of the catchment (Hennig and others, 2021). The target for the nutrient load is 25 t a year.
The nitrogen cycle
Nitrogen moves between the four spheres in a biogeochemical cycle. The air holds it as nitrogen gas, the soil and fertiliser on the farms hold it in the geosphere, the rivers and the estuary carry it dissolved in the hydrosphere, and living things build it into proteins in the biosphere. As nitrogen moves, energy is transferred and transformed too. Nitrogen fixation takes a lot of energy, which Nodularia gets from photosynthesis. Decomposers release the chemical energy stored in dead matter and use it themselves. In sediment with little oxygen, bacteria turn nitrate back into nitrogen gas, by denitrification.
Because Nodularia can fix nitrogen gas dissolved in the water (UWA), it can grow even when there is little nitrate or ammonium. Phosphorus has no gas to draw on, and the size of Nodularia’s blooms was limited by the phosphorus in the sediment (UWA). That is one reason cutting phosphorus matters so much in the Peel-Harvey.
Too many nutrients
When a body of water receives too many nutrients, producers grow out of control, and when they die, decomposers use up the oxygen. This is eutrophication. Screen 5 shows how it played out in the Peel-Harvey.
Design log
Use it
Check the science
Nodularia can grow even when there is little nitrate or ammonium in the water. Why?
Why does so much phosphorus wash off the farms on the coastal plain around the Peel-Harvey?
5Investigate
What went wrong?
What do the estuary’s records show, and how do the events link together?
Scientists, fishers and government agencies have kept records of the Peel-Harvey for decades. Put together, they show a chain of cause and effect.
This screen · about 25 minutes
- Explore the timeline, and compare the weed and the seagrass before and after the channel.
- Read what the records show.
- Put the chain of cause and effect in order, write in your design log, and do the questions.
What your design needs to know
A plan that tackles the cause of the problem has to get the chain of events right. What led to what?
Weed, then blooms
Huge mats of green macroalgae grew in Peel Inlet from the mid-1960s. The first weed to take over, a species of Cladophora, had not been recorded in Australia before. After a storm in 1979 ended its beds, other green weeds took its place. When the weed had enough light, its growth was often limited by phosphorus, so more phosphorus meant more weed (UWA). Weed piled up on the beaches and offshore banks and rotted (UWA), and in the 1970s and 1980s the weed’s blooms smothered much of the seagrass (DWER and DPIRD, 2026).
In 1978 a massive bloom of the toxic cyanobacterium Nodularia spumigena covered the whole Harvey Estuary, and blooms came regularly until 1992 (DWER, 2020). The blooms needed plenty of river flow (UWA), which brought in phosphorus and kept the water fresh. Screen 6 shows why fresh water mattered.
Running out of oxygen
When weed and algae die, bacteria decompose them and use up the dissolved oxygen. Where fresh river water lies over saltier water and the layers do not mix, which is called stratification, the bottom water can run out of oxygen. Fish that cannot escape die, in a fish kill. The first large fish kill on record, in 1910, killed millions of fish, and there was at least one fish kill every year from 1999 to 2017 (DWER, 2020).
Put the chain in order
Tap the steps in the order they happen, starting with what people did on the land.
Design log
Use it
Check the science
Why do fish often die after a bloom of algae collapses?
6Investigate
The salt switch.
What decides whether Nodularia can bloom in a given year?
Nodularia did not bloom every year. Whether it could bloom depended on how salty the water was in spring.
This screen · about 25 minutes
- Read how Nodularia’s year works.
- Run the salinity model for dry, average and wet years, and move the date through Nodularia’s year.
- Open the channel in the model and compare, then write in your design log and do the questions.
What your design needs to know
One of the criteria is no toxic blooms in the basins. What would a design have to change to stop Nodularia blooming?
Nodularia’s year
Between blooms, Nodularia survives as tough resting cells called akinetes, which lie in the sediment. As the water warms in late spring or early summer, the akinetes germinate and a bloom can grow (UWA). After 1994 the spring salinity near the bottom stayed mostly above 20 ppt, which is too salty for the resting cells to germinate (MAFRL, 1999). As summer goes on, evaporation makes the water saltier, and the blooms collapse when the salinity rises to about 30 ppt (UWA).
The salinity of the basins depends on three things: fresh water from the rivers, which makes them less salty; sea water at about 35 ppt, brought in by the tides; and evaporation, which takes away water and leaves the salt behind. Most of the river water comes in winter, so the basins are freshest in winter and early spring, and saltiest late in summer.
Design log
Use it
Check the science
Before the channel opened, after which kind of winter was a Nodularia bloom most likely?
7Design
Design a fix.
Which combination of actions would meet your criteria within the budget?
You now know how the estuary works and what went wrong. It is 1989, and it is your team’s turn to choose what to do.
This screen · about 30 minutes
- Read your criteria, then each option’s effects and side effects.
- Put together a plan that costs no more than 10 points.
- Explain your choices in your design log, then test the plan on screen 8.
Before you choose
Look back at what you wrote in your design log on screens 2 to 6. Which findings point to which options?
Causes and symptoms
The options in the catchment cut what comes in, so they work on the cause. The options in the estuary deal with what has already arrived: flushing carries nutrients out to sea and makes the basins saltier, and harvesting removes weed that has already grown. Every option has a trade-off. Replanting farmland costs farm income, the channel changes the estuary itself, and harvesting has to go on every year.
Design log
Check the science
Which part of a plan deals with the cause of the problem, rather than its symptoms?
8Test
Test and redesign.
Does your plan meet the criteria, and how could you make it better?
Designers test a design, see where it fails, change it and test it again. The simulator runs 25 years of the estuary in a few seconds.
This screen · about 30 minutes
- Predict how your plan will do, then run it and check it against the criteria.
- Run it again with new weather, and see whether it still works.
- Change one part at a time and save your best runs, then write in your design log and do the check.
Before you run it
Reading the simulator
The top chart shows the weed and the seagrass. Its dashed line at 5,000 t marks two of the criteria: the weed has to average below it over the last 10 years, and the seagrass has to end above it. Under the top chart are the phosphorus in the basins each year, the years with Nodularia blooms and with fish kills, and the crab index, a score for how good the estuary is for crabs and fish. Each year’s weather is different. Wet years wash in more phosphorus and keep the water fresher, and dry years do the opposite, so a plan that works with one weather pattern may fail with another. The drying climate option makes each year a little drier than the one before. Falling rainfall has already reduced the flows and nutrient loads reaching the estuary (Hennig and others, 2021).
The simulator is a teaching model with simple rules, tuned to behave roughly like the real estuary. It cannot forecast what a real plan would do, but it can show how the parts of a plan work together.
A fair test
Change one part of your plan at a time, and keep the same weather pattern while you compare runs. Then you know which change made the difference. When you have a plan you like, run it with new weather to see how well it copes.
Design log
Check the science
In the simulator, the weed falls only slowly after the catchment measures start, even in dry years. Why?
9Compare
What really happened.
How well did the real plan work, and how does it compare with yours?
In 1989 the Western Australian Government chose a plan with three parts. Its centrepiece, the Dawesville Channel, opened in April 1994.
This screen · about 30 minutes
- Read what was done and what changed.
- Explore the data from before and after the channel.
- Compare the real plan with your best saved run, write in your design log, and do the questions.
The 1989 plan
The government’s strategy had three parts: to “reduce the nutrient run-off from the catchment”, “continue harvesting macroalgae as necessary” and “increase flushing to the ocean” (MAFRL, 1999, citing PIMA, 1994). To increase the flushing, a new channel to the sea was cut at Dawesville, joining the ocean to the northern end of the Harvey Estuary. The construction agreements were signed on 6 January 1992. On 5 April 1994 the last sand was dug out and sea water flowed through, and the channel was officially opened on 23 April (Bradby, 1997). It is about 2.5 km long and 200 m wide (Wikipedia).
What changed
The channel more than trebled the volume of sea water exchanged with the ocean, the water became clearer, and the basins became saltier (DWER, 2020). No Nodularia blooms were reported in the Harvey Estuary in the five years after it opened (MAFRL, 1999), and DWER (2020) credits the channel with preventing blooms in the basins. The weed fell, and the seagrass came back: the 2021 survey found the most seagrass of the 64 surveys made since 1978 (D’Souza and others, 2025). By February 2025 seagrass covered about 71% of the estuary, up from 55% in 2021, but green weed had spread too (DWER and DPIRD, 2026).
But the flushing works mainly near the channel (MAFRL, 1999), and the rivers still carry nutrients in. Nodularia bloomed in the Serpentine River in 1997 and 1998 (MAFRL, 1999), and harmful blooms and low oxygen now happen mainly in the lower Murray and Serpentine rivers (DWER, 2020). There was at least one fish kill every year from 1999 to 2017, and apart from one good breeding year in 2010, very few young black bream were seen in the 17 years up to 2020 (DWER, 2020). The catchment still sends in about 60 t of phosphorus a year, more than twice the target (Hennig and others, 2021).
Design log
Use it
Check the science
After the channel opened, where did most of the harmful blooms and low oxygen happen?
10Report
Show what you know.
What did your team design, how well did it work, and what does the Peel-Harvey show about energy and matter in an ecosystem?
Designers finish by reporting what they made, the evidence that it works, and what they would change next.
This screen · about 40 minutes
- Check your results on screens 1 to 9.
- Read back through your report card and your design log.
- Write your design report, here or on the printable report.
My design report
Peel-Harvey design report
Five pages: the brief and your criteria, a food web and the nitrogen cycle to complete, a record of each design and test, and your design report.
For teachers
Curriculum
School Curriculum and Standards Authority (SCSA), Earth and Environmental Science ATAR Year 11 syllabus, for teaching from 2026, Unit 2: Earth processes. The syllabus asks for energy and matter flow to be applied to a Western Australian case study, and this lesson is one. It also touches one point of the Year 12 syllabus (for teaching from January 2026), Unit 3: Managing Earth resources. SCSA’s copyright notice says its syllabuses “may be freely copied, or communicated on an intranet, for non-commercial purposes in educational institutions”. The points the lesson teaches:
Year 11, Unit 2: Earth processes, Science Understanding
- thermal and light energy from the Sun drives important Earth processes, including evaporation and photosynthesis
- photosynthesis is the principal mechanism for the transformation of energy from the Sun into energy forms that are useful for living things
- energy and matter flow through the biotic and abiotic components of an ecosystem, and human activities influence this flow; applied to a Western Australian case study
- biogeochemical cycling of matter, including nitrogen, involves the transfer and transformation of energy between the biosphere, geosphere, atmosphere and hydrosphere
Year 12, Unit 3: Managing Earth resources, Science Understanding (Renewable Earth resources)
- human activities affect the quality and availability of fresh water, including aquifer recharge, desalination, over-extraction, land clearing and eutrophication
Where the lesson covers each point:
- Thermal and light energy from the Sun driving evaporation and photosynthesis: screen 3 (the Sun’s heat evaporating water from the basins, and light powering photosynthesis) and screen 6 (evaporation making the basins saltier in summer, in the salinity model), q-photo. No check asks about evaporation, so ask students why the basins get saltier through summer.
- Photosynthesis as the principal way the Sun’s energy is turned into forms useful to living things: screen 3 (the equation, and a food web that starts from sunlight), q-photo, n-energy.
- Energy and matter flowing through the biotic and abiotic components of an ecosystem, and human activities changing that flow, applied to a Western Australian case study: the whole lesson. Screen 2 sorts the Peel-Harvey’s biotic and abiotic parts (the slice through a basin and the card sort, q-abiotic, q-decomp); screen 3 follows energy through the food web and the energy pyramid (n-energy, q-crab); screen 4 follows phosphorus from the farms to the estuary and the sea (n-beef, n-cut, q-sand); screen 5 shows how land clearing and fertiliser led to weed, toxic blooms and fish kills (n-weed, q-oxygen); screens 7 to 9 test human actions, including the Dawesville Channel (q-cause, q-lag, q-rivers, n-seagrass).
- Biogeochemical cycling of nitrogen, with the transfer and transformation of energy between the four spheres: screen 4 (the nitrogen cycle model, with stores in all four spheres, six processes, and the energy used in fixation and uptake and released in decomposition), q-nfix.
- Year 12, human activities affecting the quality of fresh water through land clearing and eutrophication: screens 4 and 5 (cleared land, nutrients in the rivers, eutrophication, and fish kills in the rivers) and screen 9 (the rivers after the channel). The lesson’s case is an estuary and the rivers that feed it. It does not cover aquifer recharge, desalination or over-extraction; the Western Australian page lists the lessons that do.
The design challenge also practises inquiry skills: using a model, planning fair tests that change one variable at a time, and judging a model’s limits against real data.
How the lesson is taught
The lesson uses design-based learning. Screen 1 sets a design brief, and students rank the criteria a fix has to meet. Screens 2 to 6 investigate the science the design needs, and each ends with a design log entry on what the finding means for the plan. Screen 7 is the design, screen 8 tests and redesigns it in a simulator, screen 9 compares it with what was really done, and screen 10 is the design report. The structure follows Learning by Design (Kolodner and others, 2003), in which a design challenge drives the science, and teams test, share and improve their designs in cycles. A meta-analysis of 37 studies with 52 effect sizes found an overall effect of design-based learning on achievement in school students of g = 0.602, larger in science (g = 0.703) than in maths (g = 0.418). Studies that assigned students at random found a smaller effect (g = 0.258) than those that did not (g = 0.623), so the size of the benefit is less certain than the overall figure suggests (Delen and Sen, 2023).
Teams of three or four work well. Two short whole-class stops help. After screen 1, ask each team to share its top-ranked criterion and why, and point out that teams have ranked them differently. After the first runs on screen 8, have teams present their best plan and how it scored, then let them borrow ideas from each other before they redesign. Kolodner’s team called this a gallery walk. Hold back screen 9 until teams have saved at least one run, so they judge the real plan against their own.
Every screen has a model or diagram to work with: the map and the criteria on screen 1, the slice through a basin on screen 2, the food web and the energy pyramid on screen 3, the phosphorus model and the nitrogen cycle on screen 4, the timeline, the weed and seagrass chart and the chain on screen 5, the salinity model and Nodularia’s year on screen 6, the design board on screen 7, the simulator on screens 8 and 9, the before-and-after charts on screen 9 and the report card on screen 10. The plan, the ranking and the saved runs carry from screen to screen.
Screens 2 to 9 take about 25 to 30 minutes each, and screen 10 about 40 minutes: plan four or five lessons. The results box on screen 10 shows which I can statements a student got right first time, from the number answers and Check the science questions on screens 1 to 9. The design log and the report are not marked.
Handle with care
- Some students’ families farm in the catchment or work in fishing. The lesson is about the evidence for where the nutrients come from and what works, not about blaming farmers.
- The Bindjareb Noongar people call the estuary Djilba (Wikipedia), and the government’s protection plan is named Bindjareb Djilba (DWER, 2020). To include Traditional Owner knowledge of the estuary, invite local Noongar Elders or knowledge holders, following your school’s protocols.
- Blooms of cyanobacteria can be toxic. If students visit a lake, river or estuary, remind them not to touch scum or swim in discoloured water.
About the data and the models
- Map (screen 1): drawn by hand to about 15 units a kilometre, with north up. The coastline, the basins and the channels are simplified, and the coloured areas show where each problem was, not its exact extent. The weed, bloom and seagrass shading for each step follows the sources named in the text.
- Criteria (screen 1): the five outcomes and the budget are the lesson’s own, built from the problems in the sources. The ranking is saved and shown on screens 7, 8 and 10; it does not change how plans are scored.
- Food web (screen 3): the links are from diet studies of the Peel-Harvey and the nearby Leschenault Estuary (Campbell and others, 2021; Potter and others, 2000). The pyramid’s 20,000 kJ is a model number, and the efficiency slider runs from 5% to 20% around the 10% average (Pauly and Christensen, 1995).
- Phosphorus model (screen 4): the multipliers are model numbers (a dry year 0.6, a wet year 1.6; loam or clay 0.35 of sand; less fertiliser 0.6 and more 1.4) chosen to show the pattern. The land-use chart is real (Hennig and others, 2021), with everything else worked out as 60 t less the four named uses.
- Salinity model (screen 6): one well-mixed box of 117 million m³, the sum of the two basins’ volumes (UWA). River flow is 250, 450 or 750 GL in a dry, average or wet year, spread over the months as 1, 1, 1, 2, 5, 14, 24, 24, 15, 8, 3 and 2%; for comparison, the mean discharge was 398 GL a year in 1997 to 2007 (DWER). Each day, 1.0% of the water mixes with sea water at 35 ppt before the channel and 3.2% after it, and evaporation raises the salinity by up to 1.0% a day, following a cosine that peaks on 16 January and is zero from 18 April to 16 October. The model runs three years and shows the third. The flushing rates and the monthly pattern are model choices, set so that the model matches the seasonal pattern in the 1999 monitoring report (MAFRL, 1999).
- Nodularia’s year (screen 6): the resting cells germinate on the first day from 1 November with salinity below 20 ppt, the germination stage is shown for 10 days, the bloom lasts until the salinity reaches 30 ppt, and the collapse is shown for three weeks. In the model, germination happens before the channel in every kind of year, and never after it.
- Design board (screen 7): the cost points are a model choice. The cuts come from DWER’s (2020) table of the cuts modelled for the Peel-Harvey catchment: fertiliser matched to soil tests on all beef and dairy farms 40%, soil amendments on all of them 35%, replanting 24,770 ha of grazing land 33%, fencing stock out of 1,394 km of streams and drains 3%, the dairy effluent code on every dairy 2%, and water-sensitive design in all towns (0.7 t) with sewerage for 1,074 homes on septic tanks (0.2 t), entered together as 1.5%. Cuts from several measures are multiplied, not added, and the amendment cut is scaled by the share of the farmland treated.
- Simulator (screens 8 and 9): each year’s rain is a random share of an average year (log-normal, about 30% either way, kept between 0.45 and 1.8) from a numbered weather pattern, so a pattern can be run again. The drying climate takes a further 1.2% of the average off each year, so the last year has about 71% of the rain it would otherwise have. The phosphorus from the catchment is 100 × the year’s rain share, less the plan’s cut, which builds up over the first five years. The phosphorus in the basins is the catchment load plus 30% of a sediment store, divided by 2.6 once the channel is open (from 1994); the store keeps 88% each year and gains 12% of 1.15 × the basin phosphorus. Spring salinity comes from the salinity model for 450 GL × the rain share. A bloom happens when spring salinity is below 20 ppt, the basin phosphorus is at least 45 and the rain share is at least 0.8. Weed moves 60% of the way each year towards 18,000 × P² ÷ (P² + 60²) tonnes, 30% less with harvesting. Seagrass grows by up to 22% a year towards a limit of 14,000 t × the light, where the light is 1 − weed ÷ (weed + 6,000), less 0.25 in a bloom year. A fish kill happens in the rivers when the catchment load, times a random factor from 0.9 to 1.1, is over 62; the channel does not change this, and DWER (2020) reports that the lower reaches of the rivers have stayed poor since it opened. The crab index is 40 + 50 × seagrass ÷ (seagrass + 4,000), less 15 in a bloom year and 5 in a fish-kill year. A run starts in 1990 with 15,000 t of weed, which is DWER’s figure for spring 1994, 900 t of seagrass and 100 in the sediment store; the seagrass and sediment figures are model numbers. The rules are tuned so that the channel and weed harvesting alone, with the default weather, give roughly what happened: the basin blooms stop after 1994, the weed falls to about 3,000 to 6,000 t, the seagrass passes 5,000 t in the early 2000s, and fish kills go on in most years.
- With the default weather (pattern 7, drying), five plans meet all six criteria. All of them join the channel to fertiliser matched to soil tests and some soil amendments, and the cheapest is the channel, the fertiliser and half the farmland treated (9 points). Over the 900 weather patterns that Run with new weather can draw, that plan meets all six in 891 with the drying climate on and in 523 with it off. With pattern 7 and the drying climate off, no plan meets all six, because none with the channel can afford a big enough cut in the catchment to pass the fish-kill test. Plans that work only in the catchment rarely stop the basin blooms: the phosphorus the sediment releases adds to what the rivers bring, so wet years still push the basins over the bloom threshold. The best of them (a 75% cut, 10 points) meets all six in 122 of the 900 patterns with the drying climate on and in none with it off. The channel and harvesting (8 points) meet five, failing on fish kills, as in the real estuary; with the drying climate off, about a third of the patterns also fail on weed.
- Real data: the history, the loads and land uses, the diets, the channel, the exchange, the salinity ranges and the weed and seagrass figures (screens 1 to 6 and 9) come from the sources named on the page.
Where sources disagree, and what to check
- The cost of the channel: DWER’s estuary page and its 2020 plan give $76 million, Wikipedia gives about $37 million, and on 3 January 1989 Cabinet approved a package of funding and management measures, including land purchase and building the channel, costing over $54 million (Bradby, 1997). The design board uses DWER’s figure.
- When construction started: Wikipedia says it began in 1990, while Bradby (1997) says the construction agreements were signed on 6 January 1992 and the first dunes were moved less than four weeks later. The lesson gives Bradby’s dates.
- The phosphorus load: DAFWA (2013) gives 145 t a year against a target of 75 t, from earlier modelling. Hennig and others (2021) give 60 t a year for 2006 to 2015 and a target of 25 t. DWER’s water quality improvement plan (2025) gives 59 t and 24 t for the coastal plain part of the catchment, a cut of 59%, and for nitrogen 552 t and 293 t, a cut of 47%. The lesson uses Hennig and others throughout, so that its numbers add up.
- Weed and seagrass: DWER (2020) gives 6,553 t of macroalgae and 10,322 t of seagrass in 2017, against spring averages of 3,972 t and 1,793 t in 1995 to 2000, though its chart labels the 2017 seagrass 10,122 t; the lesson uses the figure in its text. D’Souza and others (2025), who compared methods and whose 2018 and 2021 surveys were in summer and autumn, give 4,530 t and 10,320 t for 2018, 3,970 t and 10,990 t for 2021, and a 1995 to 2000 average of 2,480 t of macroalgae, and warn that their totals should be viewed with caution because few sites were sampled. Their finding that the weed almost doubled compares 2018 and 2021 with their own 1995 to 2000 figure, not DWER’s. The charts use DWER (2020) only, so each chart has one source. The 2024–25 snapshot gives areas, not tonnes: seagrass over about 71% of the estuary in February 2025, up from 55% in 2021, and macroalgae over about 82% (DWER and DPIRD, 2026).
- When the weed began: UWA’s account dates the huge mats in Peel Inlet from the mid-1960s, and DWER (2020) reports seagrass loss and more macroalgae by the late 1960s. The 2024–25 snapshot says macroalgal blooms began in the 1940s, and that the widespread loss of seagrass, smothered by the weed, came in the 1970s and 1980s (DWER and DPIRD, 2026).
- Flushing: MAFRL (1999) gives 10% of the estuary’s volume flushed each day after the channel opened, citing PIMA (1994), so the figure is an estimate made in the year the channel opened; n-flush uses it. The salinity model’s 3.2% a day is lower because it treats the basins as one well-mixed box, and most of the exchange happens near the channel (MAFRL, 1999). Its 1.0% a day before the channel is lower than n-flush’s 3.3% for the same reason.
- Spring salinity before the channel: MAFRL (1999) reports below 10 ppt for much of spring. The salinity model’s monthly means for September to November are about 11 to 17 ppt in an average year and 7 to 14 ppt in a wet one, a little saltier than the measurements.
- The UWA page on physical properties gives the inlet (Mandurah) channel as 5 km long and 200 m wide, and Wikipedia gives about 2.5 km. The lesson does not give a length for it.
- The cuts from the catchment measures: DAFWA (2013) gives general estimates, for no particular catchment, of about 10% for fertiliser management, about 40% for soil amendments and less than 5% each for buffers and for dairy effluent. The design board uses DWER’s (2020) figures, which were modelled for the Peel-Harvey catchment with every farm and town taking part.
- Germination after the channel: MAFRL (1999) warned that “a year of high spring rainfall could create conditions conducive for the germination of Nodularia akinetes”. In the simulator even the wettest possible year leaves the spring salinity just above 20 ppt after the channel, so a plan with the channel never has a bloom after 1994.
Answers at a glance
- Screen 1: x-design, so that every design can be tested against the same measures of success.
- Screen 2: the card sort, seagrass and Nodularia producers, the mullet and the crab consumers, the bacteria decomposers, and the salinity, the phosphorus and the detritus non-living; q-abiotic dissolved oxygen; q-decomp dead material piles up and its nutrients are not returned.
- Screen 3: the food web has 19 links; n-energy 200 kJ; q-photo stored as chemical energy in glucose; q-crab most of the energy is used for living and lost as heat, or stays in parts that are not eaten.
- Screen 4: n-beef 67% (66% to 68% accepted); n-cut 58% (57% to 59% accepted); q-nfix it fixes nitrogen gas; q-sand the sandy soils hold little phosphorus.
- Screen 5: the chain runs land cleared and fertilised, rain washes nutrients out, rivers carry them in, weed grows, Nodularia blooms in a fresh spring, the bloom dies and uses up the oxygen; n-weed 73.5% (72.5% to 74.5% accepted); q-oxygen decomposers use up the oxygen.
- Screen 6: n-flush 3.3% a day (3.2 to 3.4 accepted); q-salt after a wet winter.
- Screen 7: q-cause cutting the phosphorus from the catchment.
- Screen 8: q-lag the phosphorus stored in the sediment, and the five years the measures take to work.
- Screen 9: n-seagrass 5.8 times (5.7 to 5.9 accepted); q-rivers the lower Murray and Serpentine rivers.
Saved progress
Answers, choices, plans, runs and notes are saved only in this browser on this device. Nothing is sent anywhere.
References
- Bradby, K. (1997). Peel-Harvey: The decline and rescue of an ecosystem. Greening the Catchment Taskforce. Parts republished by the Peel-Harvey Catchment Council: chapter 8, From estuary to ocean: the Dawesville Channel, and excerpts from chapters 6 and 7 (Assessing Dawesville).
- Campbell, T. I., Tweedley, J. R., Johnston, D. J. and Loneragan, N. R. (2021). Crab diets differ between adjacent estuaries and habitats within a sheltered marine embayment. Frontiers in Marine Science, 8, 564695. https://doi.org/10.3389/fmars.2021.564695
- Delen, I. and Sen, S. (2023). Effect of design-based learning on achievement in K-12 education: A meta-analysis. Journal of Research in Science Teaching, 60(2), 330–356. https://doi.org/10.1002/tea.21800. Summary: NARST research brief.
- Department of Agriculture and Food, Western Australia (DAFWA) (2013). Nutrient export (phosphorus). Section 2.9 of Report card on sustainable natural resource use in agriculture in Western Australia.
- Department of Water and Environmental Regulation (DWER) (n.d.). Peel-Harvey Estuary. Healthy Estuaries WA.
- Department of Water and Environmental Regulation (DWER) (2020). Bindjareb Djilba (Peel-Harvey estuary) Protection Plan. Government of Western Australia.
- Department of Water and Environmental Regulation (DWER) (2025). Water quality improvement plan for the Peel-Harvey estuary system (Gabi Warlang Bidi). Government of Western Australia.
- Department of Water and Environmental Regulation and Department of Primary Industries and Regional Development (DWER and DPIRD) (2026). Seagrass and macroalgae snapshot: Bindjareb Djilba (Peel-Harvey estuary) 2024–25. Healthy Estuaries WA.
- D’Souza, F. M. L., Bennett, K., da Silva, E. T., Thornton, H. and Kilminster, K. (2025). Quantifying seagrass and macroalgae in the Bindjareb Djilba (Peel-Harvey estuary), Western Australia: a comparison of methods. Water Science Technical Series, report no. 91. Department of Water and Environmental Regulation.
- Hennig, K., Kelsey, P., Hall, J., Gunaratne, G. G. and Robb, M. (2021). Hydrological and nutrient modelling of the Peel-Harvey estuary catchment. Water Science Technical Series, report no. 84. Department of Water and Environmental Regulation.
- Kolodner, J. L., Camp, P. J., Crismond, D., Fasse, B., Gray, J., Holbrook, J., Puntambekar, S. and Ryan, M. (2003). Problem-based learning meets case-based reasoning in the middle-school science classroom: Putting Learning by Design into practice. Journal of the Learning Sciences, 12(4), 495–547. https://doi.org/10.1207/S15327809JLS1204_2
- Marine and Freshwater Research Laboratory (MAFRL), Murdoch University (1999). Water quality of the Peel Harvey Estuary, the five-year report on the Dawesville Channel, for monitoring directed by the Water and Rivers Commission. On UWA’s Peel-Harvey estuary pages: Executive summary, Introduction and Discussion. The report cites the Peel Inlet Management Authority (PIMA, 1994).
- Pauly, D. and Christensen, V. (1995). Primary production required to sustain global fisheries. Nature, 374, 255–257. https://doi.org/10.1038/374255a0
- Potter, I. C. and others (2000). The fish fauna and finfish fishery of the Leschenault Estuary in south-western Australia. Journal of the Royal Society of Western Australia, 83, 481–501.
- Ramsar Sites Information Service (n.d.). Peel-Yalgorup system.
- School Curriculum and Standards Authority (2023). Earth and Environmental Science ATAR Year 11 syllabus, for teaching from 2026.
- School Curriculum and Standards Authority (n.d.). Earth and Environmental Science ATAR Year 12 syllabus, for teaching from January 2026.
- University of Western Australia (UWA) (n.d.). Peel-Harvey estuary pages: Physical properties, Water movement and exchange and Symptoms of nutrient enrichment.
- Wikipedia (n.d.). Dawesville Channel.
- Wikipedia (n.d.). Peel-Harvey Estuarine System.